Building Zone takes Delivery of Latest Panelization System

BZI has added a new Innovatech Panelization Equipment suite to its arsenal of steel erection equipment, making it the third and most advanced building system in operation.  It has enabled increased workload capacity for Building Zone and has hired additional men to its work force to operate the new machinery.  Innovatech introduces more power and increased mobility over rougher terrain, enabling work crews to navigate through the work site without bogging down in low spots and soft soils.

“It will make us even more efficient, over what we’ve seen at sites where wet weather has bogged us down in the past” says Jim Harker.

Building Zone has renewed its agreement with Innovatech for continued exclusive engineering and testing of current systems for improvement and development of its innovative designs.  Patent filings have been updated, and Innovatech hopes to keep the innovation coming at a brisk pace.

Leave a Reply

Your email address will not be published. Required fields are marked *